1985 – The new Seven Mile Bridge and the Long Key Bridge, both completed in 1982, were suffering from structural problems. Guardrails on the Seven Mile Bridge were spalling, and elements of the underside were deteriorating. Issues with the Long Key Bridge required that a model of it be built in Tallahassee so engineers could conduct stress tests.